Scaffolding for mechanical assembly and anti-acid coating inside the new Bleach Tower Dual in the Ence paper mill in Navia.

Between November and December 2015, Alfran assembled the exterior and interior of the Bleach Tower Dual group, needed for the mechanical assembly of the group, which could later be used to install the anti-acid coating on the inside of the equipment. Working two shifts during assembly, having to perform a structural analysis of the scaffolding due to the special loads it was subject to, this project required over 25 assemblers for the scaffolding, and a total of 8,500 hours/worker.

Location

Asturias, España.

Date

2015

Sector

Others

Speciality

Scaffolding (Other Activities)