BLAST FURNACE PROJECT, LÁZARO CÁRDENAS, ARCELOR
MITTAL, APRIL 2024. MEXICO.
The work carried out was the demolition and installation of all the refractory material in cooker no. 3, without shutdown, where all safety measures were taken to avoid any type of incident/accident, typical in hot work. Prior to the work, all the pre-assembly of the equipment was carried out on level 0, a high-precision job, which was performed by our team of specialists. A project finished on time with our client, with the quality that characterises us.