HOLCIM CARBONERAS PROJECT, ALMERÍA. MARCH 2024. SPAIN.
In the maintenance shutdown of Holcim Carboneras, Almeria, Spain, we have executed the works of brick assembly in the rotary kiln and the refractory castable installation in the exchanger tower.
In this shutdown, we have been the only refractory contractor, including the supply of materials, robotic demolition services in the cyclone roof and smoke chamber and installation by Shotcrete and Pumpcrete systems in the entire exchanger tower.
This job has been a success in terms of safety, quality, and performance. We have been congratulated by the customer, through a letter of recommendation.
Location
Carboneras (Almería)
Date
March 2024
Sector
Cement
Speciality
Refractory