ALFRAN Participates in the Renovation of the Refractory Linings at Cemex Demopolis



ALFRAN refractory lining project at Cemex Demopolis

In September 2026, ALFRAN materials were used to renew the refractory linings at Cemex Demopolis, in the United States, during the K1 maintenance shutdown. The project covered several areas of the facility, including the main burner, cooler, feed areas and cyclones.

Installation work was carried out by EZ Refractories. According to the project report, coordination between the plant, the installation company and the technical team allowed the work to proceed without incidents or delays.

Refractory work across different areas of the cement plant

The scope of the project required specific solutions for different equipment and areas. In the main burner, DRYTECH 95 was used at the tip and DRYTECH 85 in the body, installed using formwork and casting.

In the cooler, the work included walls, roof sections and the component known as the bull nose. Materials from the DRYTECH range were used, including AJ PUMP DRYTECH 85 and AJ PUMP DRYTECH CLEAN 60, with installation techniques suited to each area.

The project also covered feed areas, localised repairs to the kiln hood, and work on cyclones and raw meal feed ducts. This scope allowed several refractory linings to be maintained during a single shutdown.

Refractory lining work on the main burner at Cemex Demopolis

Materials and installation techniques adapted to each application

In addition to the DRYTECH solutions, the project incorporated AJ PUMP ABR CLEAN +, AJ PUMP 70 SIC and TIX 35 SIC. Material selection and installation were organised by equipment and area, following the technical guidelines recorded in the report.

The techniques used included installation with formwork and casting, and installation with formwork and pumping. The project documentation also covers preparation, anchor placement and formwork assembly before applying the materials.

This work sequence demonstrates that a refractory project involves material selection as well as preparation and installation of the lining.

Refractory maintenance work in the cooler at Cemex Demopolis

Positive feedback on installation

The technical report records a favourable assessment of the materials during installation, with no deviations reported at that stage. The installation company also provided positive feedback on their workability and setting time.

The report also states that the technical instructions and recommendations provided were followed. The plant’s receptiveness and coordination between the teams contributed to the progress of the work.

ALFRAN: refractory solutions for cement plant maintenance

The Cemex Demopolis project demonstrates the application of ALFRAN materials in different pieces of cement plant equipment and the importance of coordinating supply, technical support and installation during a maintenance shutdown.

Are you planning refractory work at your cement plant? Contact ALFRAN to discuss your facility’s needs.



Location

Demopolis, United States

Date

September 2026

Industry

Cement

Specialty

Refractories