Installation of Epoxico Intumescent Fireproofing in Structures and Equipment, in the Construction of a new Polyethylene plant, owned by Shell and designed by Bechtel, through the method of assembling modules that are built in different patios.

Our client, Dragados Offshore Mexico, was assigned the 74 modules that make up the ECU (Ethylene Cracker Unit) and were sent by sea to Pennsylvania, United States, where the petrochemical complex is located.

Location

Altamira, Tamaulipas, México

Dates

2018-2019

Sector

Oil & Gas, Energy

Specialty

Fireproofing