2020 MAINTENANCE SHUTDOWN AT MOLINS CEMENTOS

2020 MAINTENANCE SHUTDOWN AT MOLINS CEMENTOS

In April 2020, we were awarded with the annual shutdown at Cementos Molins (Barcelona), including demolition, supply, and refractory concrete installation in different areas and installation of brick in the rotary kiln.

Around 300 tons of concrete and 25 linear meters of refractory brick were installed, being the only refractory contractor during the shutdown.

We installed our materials Clean 40 , Drytech 70 SIC, and Clean 85 G in several critical areas of the kiln

Due to the critical situation with covid 19, we had to adapt in a short frame of time to the plant measures, being congratulated by the plant for our health and safety behavior at work.