Alfran, as a specialist in HIGH-TEMPERATURE SOLUTIONS, within the power generation, once again, completed an emergency repair on a combined cycle thermal power station boiler repair. Among the materials used, the DRYTECH 65A, Refractory castable with no cement, high alumina content, specially designed for quick dryout to avoid explosion risks and special chemical attacks environment, providing high resistance to abrasion and the adhesion of materials, with exceptional performance. This product is specially designed for installation by vibrocasting. Goals achieved once again, ZERO ACCIDENTS and satisfied customer. Congratulations to all the team.














During the past months Alfran-HTR, our subsidiary in the United Arab Emirates, made the main shutdown at Unit 2 of Fujairah Cement Industries. In this project, 65 meters of bricks were installed in the rotary kiln, 138 tons of dense concrete in different units of the plant and 120 tons of our Lite LW 23 AS insulating concrete. The entire ALFRAN-HTR team was congratulated by the client for the prompt and perfect execution of the work. The outcome of a good job is a satisfied customer!


Our team was present at the major maintenance shutdown of the W8 furnace, belonging to the Rio Branco do SUL unit of the Votorantim Group, located in Paraná State, southern Brazil. Our client, once again, preferred the Alfranjet shotcrete technology, whose objective is LESS PEOPLE + LESS TIME = MINIMUM RISK OF CONTAGION. They were applied in different areas with excellent results. The work was carried out within the established deadlines with optimal performance.
Since 2007, Refractarios Alfran has been the main player in both the refractory materials supply and installation at Votorantim Cimentos plants, in southern Spain.